Jurisdiction and scope: Federal/onshore United Arab Emirates. This note is a transaction-file checklist for negotiations and formation under the current federal Civil Transactions Law. It does not state DIFC or ADGM law, determine the formalities for a particular asset or regulated contract, or address capacity, validity, performance, termination, remedies, court procedure, arbitration or enforcement except to flag the need for a separate check.
Law checked: 25 October 2026. Next review: 25 January 2027, or earlier if Federal Decree-Law No. 25 of 2025 or relevant special legislation is amended.
Short answer
Before treating an onshore UAE bargain as formed, verify four things: the negotiations were conducted in good faith; decisive information was disclosed where article 122 required it; confidential information obtained in negotiations is controlled under article 123; and the parties reached matching offer and acceptance on the article 124 elements. Article 125 makes the general formation rule subject to any special conditions imposed by law. Do not use the general code as a substitute for the form, registration, approval, consumer, banking, insurance, real-estate or other sector rules that may govern the transaction.
When this note applies
Use this checklist where the file is governed by federal/onshore UAE civil law and the immediate question is whether negotiation conduct or formation is sufficiently documented. Stop and conduct a separate legal-system analysis if the contract selects or is connected with the DIFC or ADGM, or if a special federal or emirate law regulates the transaction. The current Civil Transactions Law entered into force on 1 June 2026 and replaced the former 1985 law.
Step-by-step workflow
- Identify the legal system and any special statute first. Record why federal/onshore UAE law is being applied. List the transaction type, parties, asset, place of performance and any regulated activity. Article 125(2) expressly subjects formation to special conditions prescribed by law, so obtain the current formality, registration, approval and authority rules before relying on the general code.
- Open a negotiation chronology. Article 121 requires parties to initiate, conduct and terminate pre-contract negotiations in good faith. Record material exchanges, meeting dates, draft versions, reasons for changing or ending negotiations and the point at which each party incurred significant reliance expenditure. The same article says negotiations do not by themselves oblige a party to conclude the contract.
- Do not claim expectation damages merely because negotiations failed. Under article 121, bad-faith negotiating conduct can give rise to liability for actual damage, but the statutory measure excludes the expected benefit of the unmade contract and lost opportunities unless the parties agreed otherwise. Preserve invoices and proof of actual expenditure rather than presenting the proposed contract price as an automatic loss.
- Maintain a decisive-information disclosure log. Article 122 requires disclosure of decisive information when the other party is presumed not to know it or relies upon the first party. Each side must exercise the required care. Record the information, why it was decisive, when and how it was disclosed, the recipient and supporting attachments. Article 122 places the burden of proving concealment on the claimant and the burden of proving disclosure on the other party.
- Do not contract out of article 122. A term excluding the disclosure obligation is void. The aggrieved party may seek annulment where the statutory conditions are met. Flag any “entire agreement,” non-reliance or no-disclosure clause for specific review rather than assuming it eliminates the statutory duty.
- Protect negotiation confidentiality. Article 123 addresses confidential information obtained during negotiations. Identify information marked or treated as confidential, permitted recipients, authorised purposes and return or deletion obligations. Unauthorised use or disclosure can engage liability under the general rules, whether or not the final contract is concluded.
- Test every article 124 element. Confirm mutual consent on the essential terms; a subject matter that exists or can exist, is determinate or determinable, and is lawful to transact in; and a lawful cause. Do not import a standalone common-law consideration requirement. Commercial value may matter to the bargain, but “consideration” is not an additional element listed in article 124.
- Freeze the final offer and acceptance trail. Article 125 treats the contract as concluded when offer and acceptance are linked and agree, subject to special statutory conditions. Identify the final offer, its expiry or withdrawal terms, the authorised sender and recipient, and the exact acceptance. A response that modifies the offer is a rejection and new offer, not an acceptance.
- Resolve reservations before signing. Distinguish a final offer from heads of terms, an invitation to negotiate, a draft subject to approval or a conditional proposal. If board, shareholder, regulator, notarisation or registration action is required, say so expressly and identify whether it is a condition of authority, formation, effectiveness or enforceability under the applicable special law.
- Conduct an Arabic-text and evidence check. Where wording affects the result, compare the official Arabic text and the official English publication and record any translation issue for qualified review. Preserve signed originals, electronic records, authority documents and delivery evidence in a form usable before the selected court or tribunal.
Practical file checklist
- Legal-system and governing-law memorandum;
- Applicable special legislation, formality and approval list;
- Negotiation chronology and draft history;
- Actual reliance-cost evidence;
- Decisive-information disclosure log and delivery proof;
- Confidential-information register and permitted-use terms;
- Article 124 elements checklist;
- Final offer, acceptance and authority evidence;
- Record of conditions, reservations and approvals;
- Arabic/English text comparison where meaning is material; and
- Executed version, attachments, notices and electronic audit trail.
Common errors
- Treating negotiations as a promise that the contract will be concluded;
- Claiming the expected profit from an unmade contract without addressing article 121;
- Using a non-reliance clause as though it overrides article 122;
- Failing to record when decisive information was disclosed;
- Using confidential negotiation material for an unauthorised purpose;
- Calling a modified response an acceptance;
- Importing common-law consideration as a separate formation element;
- Ignoring special statutory formalities or approvals; and
- Applying onshore rules to a DIFC or ADGM contract without a separate system analysis.
Official sources
| Authority | Pinpoint used | Point checked |
|---|---|---|
| Federal Decree-Law No. 25 of 2025 promulgating the Civil Transactions Law — official UAE Legislation PDF | Promulgation arts 1–3 | Repeal of the former law and 1 June 2026 commencement |
| Civil Transactions Law | art 121 | Good-faith negotiations, no duty to conclude, bad-faith actual loss and excluded expectation/lost-opportunity measure absent agreement |
| Civil Transactions Law | arts 122–123 | Decisive-information disclosure, burdens of proof, non-excludability, annulment remedy and negotiation confidentiality |
| Civil Transactions Law | arts 124–125 | Formation elements, linked offer and acceptance, special statutory conditions and modified acceptance as a new offer |
Automated-research disclosure: This maintained Practice Note was rebuilt through automated review of the official Civil Transactions Law, followed by a separate claim-to-source check. It does not claim human-lawyer authorship or review. Transaction counsel must verify the official Arabic text, any special legislation and the facts before relying on the checklist.